Summary of Mineral Resource Estimates
New England Fold Belt Hub and Spoke Summary | Resources category | Cut off | Grades | Contained Metal | |||||||||||||
Tonnes (Mt) | AgEq (g/t) | Ag (g/t) | Au (g/t) | Zn (%) | Pb (%) | Cu (%) | Sn (%) | AgEq (Moz) | Ag (Moz) | Au (koz) | Zn (kt) | Pb (kt) | Cu (kt) | Sn (kt) | |||
MTC Strauss+Kylo (100% Basis)1 | Indicated and Inferred | 0.35 g/t AuEq | 6.0 | 169 | 1.6 | 1.17 | 0.33 | - | 0.06 | - | 32.7 | 0.3 | 225 | 19.8 | - | 3.5 | - |
Webbs2 | 30 g/t Ag | 2.2 | 205 | 140 | - | 1.10 | 0.55 | 0.15 | - | 14.2 | 9.7 | - | 23.9 | 11.9 | 3.3 | 0 | |
Conrad3 | see notes | 3.3 | 193 | 86 | - | 0.62 | 1.22 | 0.11 | 0.17 | 20.7 | 9.2 | - | 20.7 | 40.7 | 3.7 | 5.7 | |
Silver Spur4 | 25 g/t AgEq | 0.7 | 156 | 54 | 0.06 | 2.03 | 0.69 | 0.09 | - | 3.3 | 1.2 | <1 | 1.35 | 4.6 | 0.6 | - | |
Subtotal | 12.2 | 181 | 52 | - | 0.064 | 0.47 | 0.09 | - | 70.9 | 20.4 | 225 | 77.9 | 57.2 | 11.1 | 5.7 | ||
Twin Hills4 | Indicated and Inferred | 25 g/t AgEq | 6.1 | 52 | 48 | 0.06 | - | - | - | - | 10.3 | 9.5 | 11 | - | - | - | - |
Mt Gunyan4 | 25 g/t AgEq | 4.5 | 41 | 38 | 0.04 | 0.11 | 0.13 | - | - | 5.9 | 5.5 | 5 | 5.0 | 5.9 | - | - | |
Subtotal | 10.6 | 48 | 44 | 0.05 | - | - | - | - | 87.1 | 35.4 | 241 | 82.9 | 63.1 | 11.1 | 5.7 | ||
New England Fold Belt Hub and Spoke JORC 2012 Total | 22.8 | 119 | 48 | - | - | - | - | - | 87.1 | 35.4 | 241 | 82.9 | 63.1 | 11.1 | 5.7 |
* Scroll to right to see full table data
New England Fold Belt Hub and Spoke Summary | Resources category | Cut off | Grades | Contained Metal | |||||||||||||
Tonnes (Mt) | AgEq (g/t) | Ag (g/t) | Au (g/t) | Zn (%) | Pb (%) | Cu (%) | Sn (%) | AgEq (Moz) | Ag (Moz) | Au (koz) | Zn (kt) | Pb (kt) | Cu (kt) | Sn (kt) | |||
MTC Strauss+Kylo (100% Basis)1 | Indicated and Inferred | 0.35 g/t AuEq | 6.0 | 169 | 1.6 | 1.17 | 0.33 | - | 0.06 | - | 32.7 | 0.3 | 225 | 19.8 | - | 3.5 | - |
Webbs2 | 30 g/t Ag | 2.2 | 205 | 140 | - | 1.10 | 0.55 | 0.15 | - | 14.2 | 9.7 | - | 23.9 | 11.9 | 3.3 | 0 | |
Conrad3 | see notes | 3.3 | 193 | 86 | - | 0.62 | 1.22 | 0.11 | 0.17 | 20.7 | 9.2 | - | 20.7 | 40.7 | 3.7 | 5.7 | |
Silver Spur4 | 25 g/t AgEq | 0.7 | 156 | 54 | 0.06 | 2.03 | 0.69 | 0.09 | - | 3.3 | 1.2 | <1 | 1.35 | 4.6 | 0.6 | - | |
Subtotal | 12.2 | 181 | 52 | - | 0.064 | 0.47 | 0.09 | - | 70.9 | 20.4 | 225 | 77.9 | 57.2 | 11.1 | 5.7 | ||
Twin Hills4 | Indicated and Inferred | 25 g/t AgEq | 6.1 | 52 | 48 | 0.06 | - | - | - | - | 10.3 | 9.5 | 11 | - | - | - | - |
Mt Gunyan4 | 25 g/t AgEq | 4.5 | 41 | 38 | 0.04 | 0.11 | 0.13 | - | - | 5.9 | 5.5 | 5 | 5.0 | 5.9 | - | - | |
Subtotal | 10.6 | 48 | 44 | 0.05 | - | - | - | - | 87.1 | 35.4 | 241 | 82.9 | 63.1 | 11.1 | 5.7 | ||
New England Fold Belt Hub and Spoke JORC 2012 Total | 22.8 | 119 | 48 | - | - | - | - | - | 87.1 | 35.4 | 241 | 82.9 | 63.1 | 11.1 | 5.7 |
- The Strauss and Kylo MRE uses a 0.35 g/t AuEq cut-off within optimised pit shells. The Strauss and Klyo AgEq and AuEq Formula uses the following metalllurgical recoveries: Au 75% Ag 41%, Cu 28% and Zn 70%. The AgEq formula = Ag g/t + 120.3 * Au (g/t) + 76.6 * Cu (%) + 69.9 * Zn (%) based on metal prices and metal recoveries. The AuEq formula = Au g/t + 0.0083 * Ag (g/t) + 0.636 * Cu (%) + 0.581* Zn (%) based on metal prices and metal recoveries. The AgEq and AuEq. formula uses metal prices of Au price $2,500/oz, Ag price A$38/oz, Zn price A$5,000/t, Cu price A$13,699/t. Totals are shown based on a 100% equity basis. Under the terms of the updated WRM-TMZ JV Agreement (ASX: TMZ 23 May 2022) Thomson can earn up to a maximum of 70% equity in the Mt Carrington Project.
- The Webbs MRE uses a 30 g/t Ag cut-off and reported to 225m below surface. The Webbs AgEq Formula uses the following processing recoveries: Ag 87%, Cu 85%, Pb 70% and Zn 89%. The Webbs AgEq formula = Ag g/t + 108.5 * Cu (%) + 19.7 * Pb (%) + 34.1 * Zn (%) based on metal prices and metal recoveries into concentrate. For all deposits the metal price assumptions used, where applicable, in the AgEq formula at an exchange rate of US$0.73 were: Ag price A$38/oz, Au price A$2,534/oz, Zn price A$4,110/t, Pb price A$3,014/t, Cu price A$13,699/t Sn price A$41,096. * TMZ: ASX Release 9 June 2022.
- Conrad MRE uses a 40 g/t AgEq cut-off within an optimised pit (2.0 revenue factor) for the portion of the deposit likely mined by open pit and is constrained to domains within the underground portion of the deposit (no AgEq cut-off applied to that portion). The AgEq formula used the following recovery and processing assumptions: recoveries of 90% for Ag, Pb, Zn, Cu and 70% for Sn. AgEq was calcuated using the formula AgEq = Ag g/t + 33.3 * Zn (%) + 24.4 * Pb (%) + 111.1 * Cu (%) + 259.2 * Sn(%) based on metal prices and metal recoveries into concentrate. TMZ: ASX Release 11 August 2021.
- Twin Hills, Mt Gunyan and Silver Spur MREs are reported at 25 g/t Ag equivalent (AgEq) cut-off and reported above 100m below pit or 150m below surface for Twin Hills, 150m below surface for Mt Gunyan and 200m below surface for Silver Spur. The AgEq formula used the following metallurgical recoveries: Twin Hills Ag 78%, Au 77% ; Mt Gunyan oxide Ag 89%, Au 78%, Zn 12%; Mt Gunyan sulphide Ag 78%, Au 77%, Zn 16%; Silver Spur Oxide Ag 91%, Zn 20% Silver Spur Sulphide Ag 69%, Zn 93%, Pb 64%, AgEq was calcuated using the following formulas: Twin Hills (AgEq) = Ag ppm + 65.22*Au g/t, Mt Gunyan Oxide AgEq = Ag (g/t) + 57.91 * Au (g/t) + 4.49 *Zn(%), Mt Gunyan Sulphide AgEq = Ag (g/t) + 65.22 * Au (g/t) + 6.84 * Zn(%), Silver Spur Oxide AgEq = Ag (g/t) + 7.3 * Zn(%), Silver Spur Sulphide AgEq = Ag (g/t) + 44.92 * Zn(%) + 22.67* Pb(%) based on metal prices and metal reocveries into concentrate. * TMZ: ASX Release 1 March 2022.
Silver equivalent (AgEq) grades and ounces are shown in this table for consistency with the larger tablelands projects Hub and Spoke resource base.
In the Company’s opinion, the metals included in each metal equivalent calculation have a reasonable potential to be recovered and sold. Totals may not add up due to rounding.
Resources Reference Table
* Scroll to right to see full table data
Project | Deposit | ASX Release |
Texas | Twin Hills | ASX: TMZ - 1 March 2022, 19.5 Moz Silver Equivalent MRE for Texas Silver District |
Mt Gunyan | ASX: TMZ - 1 March 2022, 19.5 Moz Silver Equivalent MRE for Texas Silver District | |
Silver Spur | ASX: TMZ - 1 March 2022, 19.5 Moz Silver Equivalent MRE for Texas Silver District | |
Conrad | Polymetallic Deposit | ASX: TMZ - 11 August 2021, 20.7 Moz Silver Equivalent Mineral Resoure Estimate |
Webbs | Silver Base Metals Deposit | ASX: TMZ - 9 June 2022, 14 Moz Silver Equivalent Mineral Resource for Webbs |
Mt Carrington | Strauss Deposit | ASX: TMZ - 22 June 2022, Updated Polymetallic MRE for Mt Carrington Strass and Kylo |
Kylo Deposit | ASX: TMZ - 22 June 2022, Updated Polymetallic MRE for Mt Carrington Strass and Kylo |